Robust transmission network of P.S.T.C.L. helps meet with power demand of 15000 MW, says CMD

| | Chandigarh
  • 0

Robust transmission network of P.S.T.C.L. helps meet with power demand of 15000 MW, says CMD

Sunday, 26 June 2022 | PNS | Chandigarh

Punjab state transmission corporation limited  CMD,  A.Venu Prasad   on Saturday said that  due to the robust transmission network of PSTCL, Punjab met the power demand of 15000 MW during the ongoing paddy season. He said that in the recent past  power system operating corporation limited has   enhanced  the ATC/TTC (available transfer capability/total transfer capability) limits from 7100/7700 MW  to 8500/9000 MW of PSTCL . He said that with the hike in transmission capacity of PSTCL is strengthening  power system of Punjab to provide  regular 8 hours power to around 14 lacs tubewell consumers during ongoing paddy season  even  without imposing  any restrictions  on industries. He said that Punjab state load dispatch centre (SLDC), is  a unique separate accounting unit of  PSTCL, which ensures integrated operation of the power system of Punjab with the northern region load dispatch centre of India.

Sunday Edition

Chronicle of Bihar, beyond elections

28 April 2024 | Deepak Kumar Jha | Agenda

One Nation, One Election Federalism at risk or Unity Fortified?

28 April 2024 | PRIYOTOSH SHARMA and CHANDRIMA DUTTA | Agenda

Education a must for the Panchayati Raj System to flourish

28 April 2024 | Vikash Kumar | Agenda

‘Oops I Dropped The Lemon Trat’

28 April 2024 | Gyaneshwar Dayal | Agenda

Standing Alone, and How

28 April 2024 | Pawan Soni | Agenda