The final trial run of Bhopal Metro will be done on October 3 and for this, Subhash Nagar and RKMP metro stations have been decorated Chief Minister Shivraj Singh Chauhan will flag off the final trial run.
He will also travel in the metro from Subhash Nagar to RKMP station. Earlier on Monday, the metro coach was brought back on track. Metro crossed DB Mall, Kendriya School, MP Nagar areas.
The road between MP Nagar and Subhash Nagar depot has been made. At the same time, the path below the Central School Station has also been opened. Due to this, people no longer have to roam around. They are coming and going from MP Nagar directly to Subhash Nagar overbridge and underbridge. Road construction work will also take place between Jhinsi. This road was closed for about a year.
Due to the final trial run of Metro, the road between MP Nagar and Subhash Nagar depot has been built. At the same time, the road below Kendriya School Metro Station has also been opened.
Will address the program before the inauguration
Chief Minister Shivraj Singh Chouhan will inaugurate the final trial run of the Metro at 11 am. Before this, he will also address the program at Subhash Nagar Depot. Then the coach will be flagged off. They will board the metro and reach Rani Kamlapati station. The trial run will be between Subhash Nagar and RKMP station. During this period, Kendriya School, DB Mall and MP Nagar station will also come. However, the metro will not stop here. The final trial run of Indore Metro was done two days ago.
A team of more than 50 people including senior engineers, technical experts, supervisors were engaged in connecting and testing the coaches. After working for 8 days, it was seen running on the metro track on 26 September. The metro was brought back on track several times for 6 days. On Monday also the metro was seen running on the tracks.
Although the metro will pass through five stations, the focus stations are Subhash Nagar and RKMP. Chief Minister Chouhan will board the metro from Subhash Nagar station and alight off at RKMP station. The work of escalator, stairs and foot over bridge was completed at Subhashnagar station. Red carpet was laid here on Monday. Metro coaches and stations are being decorated with flowers.