PWD upgrading Assembly’s infrastructure with two projects

| | New Delhi
  • 0

PWD upgrading Assembly’s infrastructure with two projects

Friday, 30 May 2025 | Pioneer News Service | New Delhi

The Public Works Department (PWD) is upgrading the Delhi Assembly’s infrastructure with two new projects one of which involves the repair of existing infrastructure while the second is the construction of a gazebo in the chief minister’s park, officials said on Thursday. These projects follow Assembly Speaker Vijender Gupta’s push for infrastructure upgrades.

According to the plan, a project has been approved to repair the toilet blocks in the Assembly hall and MLA lounges along with the upgradation of cabinets in the pantry and the repair of the boundary wall starting near the reception area up to gate number two of the assembly campus. The cost of this project is around `48 lakh.

“A tender has been floated for the project and work will take around one and a half months to complete from the time work is awarded. Other technical interventions are also being made on the campus,” a PWD official said.

The PWD will construct a gazebo (seating structure) inside the Chief Minister Park at Delhi Assembly to create a space to sit. The cost of this project is around `30 lakh.

“The structure will be made of pink sandstone, having a height of five metres in an octagonal gazebo design. Between the pillars of the gazebo, ‘jali’ will be installed under the curved roof according to the design approved by the Assembly authorities,” the tender says.

Since taking over as Speaker, Vijender Gupta has made a series of announcements on the revamp of the Assembly campus. Earlier, for the end-to-end digitisation process, she signed an MoU last month with the Ministry of Parliamentary Affairs for the implementation of the National e-Vidhan Application (NeVA) in the Delhi Assembly. This project will cost around `15 crore and be completed in one and a half months.

This would be the third such intervention after the PWD started working on the digitisation project according to the specifications given by authorities. The other two are the opening of three recreational centres for senior citizens and a project for the construction of a new solar power plant in the past month.

State Editions

NSUT holds third convocation ceremony with great splendour

14 December 2025 | Pioneer News Service | Delhi

Govt to tackle air pollution with monthly meetings

14 December 2025 | Pioneer News Service | Delhi

Speed limit on Noida and Yamuna Expressway reduced

14 December 2025 | Pioneer News Service | Delhi

Govt directs women employees should not stay beyond office hours

14 December 2025 | Pioneer News Service | Delhi

Doctors report 20%-30% jump in respiratory cases

14 December 2025 | Pioneer News Service | Delhi

Sunday Edition

A Pivotal Engagement in the 1971 Indo-Pak War

14 December 2025 | Gaurav Bhakhri Lt  Colonel | Agenda

The 15 second rule: A pause is powerful

14 December 2025 | Gurudev Sri Sri Ravi Shankar | Agenda

The Indian paradox of power, participation, and exclusion

14 December 2025 | Team Agenda | Agenda

A passage through ritual

14 December 2025 | Mythri Tewary | Agenda

Mizoram: Where scenic splendour meets soulful cuisine

14 December 2025 | Anil Rajput | Agenda